Three tests every parking operation has to pass
Technically feasible, commercially viable, operationally sustainable. Most projects that fail were strong on one test and silent on the other two.
Every parking or mobility project I have worked on has been judged, sooner or later, by three questions. Can the site physically do it? Does it make money for the people who have to keep it running? Can a real team run it every day without heroics?
I call these the three tests: technically feasible, commercially viable and operationally sustainable. Missing any one of them is a fail. The trouble is that each test is usually owned by a different person, and they rarely sit in the same room until something breaks.
Test one: technically feasible
This is where engineers and consultants are strongest. Gates, lanes, ramps, stacking space, equipment and systems. The common mistake is designing for the average day.
A campus I recently looked at had 1,465 spaces and lease entitlements that would require 1,750 at full occupancy. On an average Tuesday, the gap is invisible. At 9 a.m. on the busiest day of the quarter, it is 285 cars with nowhere to go. Technical feasibility starts with the real peak, and with a clear answer to a simple question: when the system stops, where does the queue go?
Test two: commercially viable
This is where finance is strongest, and where spreadsheets can be most convincing while being most wrong.
Two habits have saved me more than once. First, before a model forecasts next year, it has to reproduce last year's actual P&L. If it cannot explain what already happened, it has no business predicting what will. Second, every model needs a walk away point written down before the negotiation starts, not during it.
Viability also has to be fair. On that same campus, an approved model charged tenants for stacked spaces that their leases already entitled them to. It made the numbers work and would have destroyed trust in the first month. We replaced it with a landlord funded, pay per use capacity service. Commercially viable means viable for everyone who has to sign, pay and stay.
Test three: operationally sustainable
This is the test that gets the least attention in a tender and the most attention after go live.
The questions are plain. Can a new attendant use the tool at peak hour, on their second day, in their second language? Who escalates, to whom, and within how many minutes? What does the operation look like on day 300, when the launch team has gone home?
The best answers are often the simplest. For one tower, the system that freed blocked cars asked employees to type only the digits of their plate: no sign in, no app to install. Adoption was not a training problem because there was nothing to train.
Using the tests
I use the three tests in two ways.
Before bidding. If a scope fails one test and we cannot change it, we do not bid. I have walked away from a stadium tender once event days were removed from scope, because the demand that made it viable had gone. A tender you cannot run well is not worth winning.
Before signing off a design. Each test gets an owner, and each owner has to sign the other two. The engineer signs the commercial assumptions; the finance lead signs the roster; operations signs the drawings. It is slower by a week and faster by a year.
Feasible, viable, sustainable. None of it is complicated. It is just rarely done all at once.